The concrete for the basement floor and footing arrived and was poured and finished yesterday so we are finally off and running. We will have a month of what seems like weather dependent activity, but Brad has assured me that each step is less dependent on the previous until the entire foundation is poured. After that, it is just a pain in the neck for the workers to build in bad weather, but that is only until the house is framed and the roof is up. The next step is to build the forms and pour the basement walls followed by the foundation for the whole house. I think the garage will be on a slab and I am sure that is probably poured at the same time as the foundation.